Derek, I've tried to acces your Audit Scotland reports on equip mgt, but get blank Acrobat screens. Are the links still valid?
|
|
|
|
|
Joined: Feb 2004
Posts: 14,815 Likes: 72
Super Hero
|
Super Hero
Joined: Feb 2004
Posts: 14,815 Likes: 72 |
Yes, and what a nice document it is too (something to have a look at later with my cocoa). Once again, our friends North of the Border seem to be ahead of the game!
I vaguely remember a document put together by the WHO about 20 years ago, whereby a lucky bunch of lads toured the world to report on biomed problems. The jammy buggers went everywhere! Yes, recommendations were presented. But I wonder what else happened? (it's time for another world-tour, I expect). My point is – it’s all very well for management and consultants or whatever to carry out these fantastic studies and coming up with beautiful reports, but unless it then translates into actual, practical changes and improvements on the ground, in the trenches and at the sharp end, then it is all just another waste of time and money.
For myself, I can only repeat the mantra that I have banged-on about for many years (and is still very valid today, as far as I can tell) - that the key is the man, and by that I mean the quality and calibre of technical manpower in the form of biomedical engineering technicians, and also that in-house biomedical technicians are not only maintainers and repairers of equipment, but are also of necessity trainers and managers as well! That’s where the money needs to be spent – in attracting good people, training them properly, “bringing them on”, offering them a decent career structure and then retaining them. We need new blood, young, fertile minds!
By the way Paul, how about enlightening us further by pulling together this and the Risk-Centred Maintenance topic and expanding a bit on the system endorsed by your Risk Committee? Is any particular management software being endorsed, for example?
============== Long Live Low Life
If you don't inspect ... don't expect.
|
|
|
|
|
|
Anonymous
Unregistered
|
|
Anonymous
Unregistered
|
Do you do stand up as well Geoff? I've not had as good a laugh for ages. Your background obviously doesn't include long stints working in the NHS. No doubt that your next tack is that you should be the one to provide the management expertise, training and mandatory guidelines. Keep tapping the tom-toms and tooting your horn - you're funny you are.
|
|
|
|
|
Joined: Feb 2004
Posts: 14,815 Likes: 72
Super Hero
|
Super Hero
Joined: Feb 2004
Posts: 14,815 Likes: 72 |
Remind me who it was who said "Lead, Follow, or get out of the way!"
============== Long Live Low Life
If you don't inspect ... don't expect.
|
|
|
|
|
Joined: Feb 2004
Posts: 14,815 Likes: 72
Super Hero
|
Super Hero
Joined: Feb 2004
Posts: 14,815 Likes: 72 |
It’s a slow-news day. So if anybody missed this topic, it’s worth reviewing, I reckon. But please start at John’s original post at https://www.ebme.co.uk/ubb/ultimatebb.php/topic/9/168.html (ie, "is it sensible to increase the service interval?") and take it from there. Then, if you have something useful to add, let’s hear it! 
If you don't inspect ... don't expect.
|
|
|
|
|
|
Anonymous
Unregistered
|
|
Anonymous
Unregistered
|
Just some thoughts off the top of my head:
Are any of the ideas that John puts forward similar to those ideas of equipment management that insurance-based schemes follow? If they are then they're positively discouraged by the NHS. As far as I see it when you increase the period of the service interval you have to accept that a point will be reached where you start to see failures due to wear and tear (assuming the previously used manufacturers recommended interval was appropriate and the prior methods were effective of course i.e. few wear & tear failures) before PPM is due - this is the feedback and the failures due to wear & tear are the indicators that the PPM period is too long. Random failures (mechanical and electrical) and FOB (operator) problems will always occur and will be related to quantity of equipment and training but not necessarily wear & tear.
It's a fact that to be certain that the selected PPM interval is effective that an additional period of time will have to elapse, whilst the current servicing interval is maintained for all devices. During this period the failure rate due to wear and tear will probably increase, not necessarily that rapidly but it will likely increase at a faster rate as more time elapses and more feedback is collected. The decision is when to change the servicing interval and how to deal with devices that have now obviously exceeded their "inherent service requirements" i.e. they're overdue PPM or more difficult, perhaps, when to increase the interval. There's always a tendency for too long a PPM interval since that's when feedback and the indicators are provided). Ideally devices still in service but beyond the newly determined service interval would have to be pulled-in for immediate servicing so that application of this servicing method could be maintained, effectively, without introducing additional risk. Hopefully then the reduced service interval would eradicate problems with failure due to wear and tear - the objective of all planned maintenance.
If all equipment were not PPM'd at change of PPM interval (if it were found to be too long) then there would be be a number of items of equipment that would not have been serviced (at the manufacturers or the newly defined period), due PPM (on paper) and will possibly be in a condition where they're imminently likely to fail due to wear and tear when this could have been preventable via appropriate PPM inteval recommended by the manufacturer. You have effectively set up a system that you can ocasionally produce the evidence to "hang" yourself or demonstrate that you're creating additional risk if you actually choose too long a PPM interval using this iterative process for determining PPM intervals. Fine as long as you don't have a fatal incident attributed to equipment failure and end up in an inquiry.
Using John's method how do we seperate the random failures from the routine failures associated with a particular make, model and manufacturer? I ask this since I think this method John suggests is only really possible using statistics and suchlike and reliable feedback from servicing. Using statistical methods implys that there will be a significant number of identical devices that are being serviced using this method; otherwise the information gathered is probably not going to be of much use in determining service intervals generally. Thus the process becomes complex when you consider the different makes, models and type of devices in a typical hospital. We all know that particular models, brands and manufacturers equipment tend to have their own failure traits - battery failures, mechanical failures, devication from calibration, etc, etc. So the method can only really be applied, on a batch-basis, to identical types of equipment I think.
The way I look at it, in theory, John's idea of using this method makes sense if you want to make the best use of resources, you are having problems with manufacturers service intervals i.e. failures due to wear & tear, you have lots of equipment of the same type and failure due to wear and tear does not present a significant risk (if you get the PPM interval wrong), either physically or financially (as a precaution just in case you do actually get service intervals wrong). However I wonder what evidence John can produce to prove that equipment is being "over-serviced" to justify using this method - there is no evidence that servicing is not currently working until you actually promote failures by increasing the interval to justify using a different method. This does not feel the right method of justification to me. Financially and operationally for EBME maybe but not technically, considering both financial and physical risk to ALL concerned.
This approach actually makes what may have been a reliable device that was routinely serviced (or "over-serviced") at the manufacturers recommended intervals into a device that has to be proved unreliable by increasing the PPM interval so you can justify increasing the PPM interval i.e you will probably actually increase the statistical risk of equipment failing due to wear & tear in use (there will be a apread in failures over time but less "leeway" possibly, compared to intervals associated with "over-servicing") if you increase the PPM interval. What you try to achieve with this method is an acceptable balance of risk versus failure. Multiply this by many times (applied to a number of batches of different types of high-volume equipment in the hospital) and if you get it wrong you could be asking for trouble.
This method can only really be effectively applied for large batches of equipment of the same type, make and model that have identical failure traits. You'd then have to monitor all failures to seperate user problems, random failures and recognised failures associated with a lack of servicing (wear & tear). Thus there is "noise" associated with the "wear & tear" indicator used to give feedback required to set the servicing interval. There is also the issue of usage of equipment. Failure due to wear & tear is the indicator for setting PPM intervals. However wear & tear is also dependent upon the amount of use equipment gets. Now equipment of the same type in different applications or areas gets different amounts of use and abuse hence wear & tear varies across the equipment population. This method fails to address this problem since it can only really be applied to the pool of equipment as a whole, otherwise you may as well micro-manage it. Once you start to fragment maintenance down to local areas or smaller quantities of equipment it becomes impossible to manage and less effective.
If too long a PPM interval is applied across all the equipment in the pool (even if it is of the same model and I have said that I think this method has a tendency to PPM intervals that are too long) the risk is that the high-usage equipment will tend to fail before the rest of it due to wear & tear. To overcome this you'd have to set the variable PPM intervals to ensure that the majority of equipment presented minimal risk - if you had a minority of the equipment being heavily used and suffering high rates of failure due to wear & tear, and the PPM interval was set appropriately to avoid this, then the rest of the equipment would still be "over-serviced" using this method. Potentially the same situation that John was trying to argue against. If the servicing interval is too short then you have equipment out of service uneccessarily, you don't necessarily prevent the FOB and random failures that occur anyhow but you can keep on top of "routine" problems associated with equipment that fails due to wear and tear and not have as many failures in-use.
Finally you have to consider the lifetime of the equipment as well. Typically for the large batches of equipment, where this method might be applied successfully, it's only going to be 7 years or so, if that. This means there won't be time for too much chopping and changing of service intervals for most of the high-volume types of equipment this would apply to. If you only select too long as service interval once or twice in that lifetime you would probably end up with a knock-on effect where you'd be forced to "reset" servicing i.e. get to service all the affected devices as soon as you find the rate of failures due to wear and tear increasing rapidly. Otherwise your servicing method actually contributes to failures before the next PPM is due and you're back to running a breakdown service anyhow.
The problems of setting too long a service interval may fall onto patients and users if the results of wear & tear due to selection of too long a PPM interval cannot be rectified quickly (taking up the EBME manpower and resources that you're trying to save) hence increasing risk both financial and physical. I thought we were around to avoid risk to operators and patiets if we could, not create additional risk then manage it on others behalf i.e. Trust board level. At least "over-servicing" at prescribed intervals gives predictable costs, predictable periods between downtime, meets the manufacturers recommendations. Though I'm all for having shorter PPM intervals, than the manufacturer recommends, if wear & tear is an issue and the manufacturers interval is found to be too long.
Johns ideas are probably feasible if there are large volumes of the same equipment and the service interval can be "reset", i.e. all the equipment is serviced, when the interval is found to be "too long" and failures start showing-up. It's the period during which failures show-up when the risk is being taken. Thus John's idea is not suited to certain risk categories of equipment either. Users probably wouldn't tolerate the inconvenience or risk of finding an appropriate interval since this process would in fact rely upon an increase in failures flagging problems with the interval. Not good news if the equipment is life-support for example. Or if you're a manufacturer with a product that is perceived as unreliable by operators if selected PPM intervals are inclined towards risk and saving EBME resources.
Just an afterthought - if you don't see problems with equipment failing and the intervals for PPM are extended tehn it's likely that the probability of catastrophic in use will be increased e.g. electric shock, failure to ventilate, infuse, etc, etc. This means that there would proably have to be a maximum limit placed on the service interval anyhow, depending upon the risk classification of the device being considered.
|
|
|
|
|
Joined: Feb 2004
Posts: 14,815 Likes: 72
Super Hero
|
Super Hero
Joined: Feb 2004
Posts: 14,815 Likes: 72 |
Well argued, Richard! Trouble is, though, that in the “real world NHS” there would seem to be a lack of resources (in man-power, especially), so, somehow, the manager has to juggle these two elements all the time (ie, risk and resources). Also, I wonder how many places actually do their PM’s by the book, as it were? Recently I came across (and, as we used to say “no names – no pack-drill”) a volumetric IV pump of well-known, popular brand, that, according to the records, hadn’t been looked at in five years. Needless to say it wasn’t in the best of condition, but it had apparently carried on delivering the goods until giving up when the battery was finally driven into the ground. Following a couple of hours of TLC by yours truly, it was sent back to bravely suffer further abuse. Now, I would have thought that there was a bit of kit that should have been seen at least every six-months. A risk had been taken there (by somebody, although probably not consciously). So how does the manager scare senior management into providing more resources (read, funding), if the kit carries on working regardless? That is, as John has mentioned a few times before, and I myself must now grudgingly admit – kit is becoming more and more reliable (due, I dare say, to modern technology and thoughtful design – for the most part, anyway). Of course, this topic ties in nicely with the similar ideas espoused at https://www.ebme.co.uk/ubb/ultimatebb.php/topic/9/197.html Just playing the Devil’s Advocate (as usual). 
If you don't inspect ... don't expect.
|
|
|
|
|
|
Anonymous
Unregistered
|
|
Anonymous
Unregistered
|
The other side of the coin is that if the pump had failed and caused a reportable clinical incident then it would have soon prompted the risk people to do something e.g. involve EBME management and ask why the equipment wasn't serviced - then the resources would probably be found to replace all device, get the manufacturer in to service the equipment or employ more staff in EBME. These costs might actually be less than they would if John had justified having the equipment serviced regularly so in this instance the financial savings in limiting the resources for maintenance, perceived by the risk assessors, may actually be justified. In hindsight, now that the risk people are aware, if you have 20 or 30 pumps in that condition elsewhere then the associated risks of incidents in the future could be used as an argument for resources perhaps i.e. 20-30x the cost of a single device failing due to not being serviced for 5 years might be greater than actually providing the resources for servicing them properly now. Whatever way you look at it though it's all down to balance of probability and if you're a chancer or a gmabler then you might take that chance; especially if you're a Trust that's backed by insurance schemes, etc, etc. Any level of risk is evaluated by determining the probability that something, with an associated cost, will occur eventually. Applying measures to mitigate that risk, usually financially in the NHS, is balanced against the cost, usually physical in the NHS but calculated financially, allowing the current level of risk to prevail if the cost of mitigating risk is too high hence there are actually notional "savings" associated with doing nothing to mitigate a certain level of acceptable risk. Not sure how much I'd put on the value of someones health and wellbeing. Problem is, when it comes to equipment, risk is dynamic and depends on lots of other factors (type, model, usage, application, condition of patient, operator skills, condition, servicing, damage, abuse, suitability for purpose, etc, etc) that I don't believe many risk-evaluators are capable of taking on board nevermind EBME managers. Not the ones I've met anyhow. Plus lack of finance is an overriding factor - until there's an incident it seems - so it doesn't necessarily pay to manage risk properly since the penalties for allowing unacceptable risk to prevail are still small, finacially speaking, relative to the cost of mitigation. Insurance and saying you're sorry and it won't happen again M'lud is such a wonderful thing.
I would have thought that, technically speaking, one could come up with an argument that suggested equipment that isn't serviced at appropriate intervals will fail in some way, due to a lack of servicing, it eventually presents a significant risk of some sort. The problem is assessing the significance of this risk, setting aside the finances to mitigate this risk, if it's worth it, which translates to setting an appropriate PPM interval and convincing others that if it is exceeded that the likelihood of a failure in use, hence risk, financial, techncial, physical, will increase not decrease (in all probability). Unfortunately the risk-people I meet seem to rely on retrospective investigations into equipment failures or incidents to prompt action i.e. I don't think there's much projection of potential risk and balancing of this risk against possible costs, going-on with regard to equipment actually. The indicators that are being used to flag risk are wrong or not even being used in my opinion i.e. risk people are oblivious to the real risks with equipment since many are non-technical or more finance-led.
To err on the side of safety, I suppose, would be to allow "over-servicing" (as John has put it) to continue then use the "excessively short" PPM intervals (as John implies) indicated by manufacturers' to put forward the argument to the risk people that more staff are required i.e. this justifies more staff than if less PPM activity is required, as it would by extending PPM intervals locally, beyond manufacturers recommended intervals.
|
|
|
|
|
|
Anonymous
Unregistered
|
|
Anonymous
Unregistered
|
So how does the manager scare senior management into providing more resources (read, funding), if the kit carries on working regardless? That is, as John has mentioned a few times before, and I myself must now grudgingly admit – kit is becoming more and more reliable (due, I dare say, to modern technology and thoughtful design – for the most part, anyway). However, as John has quoted in postings elsewhere, the level of servicing required is related to usage in his opinion. I say it's also related to abuse but shouldn't be confused with equipment reliability. That's an additional extra that should be pushed onto the risk people. Given lots of usage over 5 years I doubt any device, particularly volumetric infusion pumps, to be operating to specification without exhibiting problems due to wear and tear or damage. I guess you were lucky that the machine had not been hammered Geoff. Generally I wouldn't classify a piece of equipment as being unreliable if it breaks down as a result of wear beyond the servicing interval - that would be an unfair assessment. Reliability should only be judged on the rate of breakdowns due to random failures, design flaws or confirmed software issues that affect operation and cause device failures between the recommended service intervals in my opinion. Operator FOB problems, susceptibility to damage and abuse should be factored out of the assessment of reliability I think since these depend upon factors outside ours and the manufacturers control to some extent and should be flagged as seperate issues to risk people. Perhaps the reason why they are never convinced is that we tend to roll these things into reliability instead of flagging them up seperately as operator issues and additional risk outside our control - we need the extra resources to cover this aspect by performing EST inspections to cover for this as required by HSE. These can be visual or visual and electrical but at least then the obvious problems are being spotted. It's severe damage due to user abuse and wear outside PPM that affects devices that are non-robust or not fit for purpose (irrespective of intrinsic device reliability assuming adequate servicing is being carried out as recommended) that goes unnoticed that presents the biggest risks if PPMs aren't carried out on a routine basis. In the past I've seen syringe devices that have been literally split in half and still being used, taped-up, with no functioning occlusion alarms and ingress inside or others where the syringe actuator is broken and allows syringe-syphoning or where mains conductors are exposed that haven't been looked at for years and never been reported by users ignorant of the risks. Never really see this problem whenever I've worked on devices have been repaired or serviced within, say, a 12 month period (unless someones owned-up and sent it in for repair after it's been abused). Unfortunately it's the neglected items that slip through the net and aren't serviced at regular-enough intervals or not reported by operators as having damage (or inspecting the service-due labels) that are the biggest risk.
|
|
|
|
|
Joined: Feb 2004
Posts: 14,815 Likes: 72
Super Hero
|
Super Hero
Joined: Feb 2004
Posts: 14,815 Likes: 72 |
No, Richard, it had been hammered! But I like your last paragraph – “real world NHS”? Users’ reporting of faults has been one of the most basic tenets of medical equipment maintenance for as long as I can remember. Hardly “rocket science”, after all. How come the message doesn’t get through, I wonder (managers hidden behind their computer screens, perhaps)? There is well-proven technique called “management by walking about” (ie, and talking to people). I recommend it wholeheartedly to all biomed chiefs. What I can’t get my head around is, in these modern times when every youngster has grown up with technology all around them, how is it that they become “ignorant abusers” in the workplace (…must be a PhD thesis for someone in that one). Don’t these people care then? They are, after all, paid to be carers, are they not? My real point about the volumetric pump was that, despite supposedly state-of-the-art computer systems and all the rest, it would seem that even simple, calendar-based routine maintenance sometimes (often?) doesn’t actually happen, whether due to lack of access, shortage of staff, poor management or whatever (or, most likely, all of the above). 
If you don't inspect ... don't expect.
|
|
|
|
1 members (daisizhou),
22,850
guests, and
88
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
Forums26
Topics11,288
Posts74,594
Members10,395
| |
Most Online69,877 Jul 17th, 2026
|
|
|
|