Hi all,
have to agree with Geoff, test results should be recorded against limits. This does, as Geoff pointed out gives some indication of Trend, which can be useful whilst conducting a PM.
We are currently using SI3C, developed from Sophie, Sophie 9000 then Asset Plus. Few minor failings but overall a very useful tool.
We are currently working on the paperless wksp, all tests are conducted through Ansur (Fluke) and tested with Fluke/Metron test equipment using test Templates/Sequences. The results are then stored electronically. The work report is then the only piece of paper left in our system. This will be eliminated fairly shortly with the introduction of electronic signatures.