John,
Missed your reply. In response, yes I believe you could use RCM for such articles. Here we would make a risk assessment which we file (nothing like covering your backside) and monitor the situation from there. Similar to RCM I suppose.

Quote:
Originally posted by John Sandham:
Das
Could you apply RCM to devices that may require service, but no service interval is suggested by the supplier?

For those you who have not read the article:
Click here.... Reliability centered maintenance


Never under-estimate the predictability of stupidity
Joined: Oct 2002
Posts: 130
EH Offline
Expert
Offline
Expert
Joined: Oct 2002
Posts: 130
Ken, I am afraid I would let the book decide. As mentioned before the manufacturer gives his recommendations who am I to argue. Why should I (as Louis constantly tells us) put my gluteus in the firing line? I feel that as millions of dollars go into R&D of medical equipment then surely we must appreciate the value of the design bods servicing recommendations. What I don’t agree with is when the sales team push “unnecessary” additional service requirements on the kit in question i.e. to milk more money from us. As mentioned by Jim earlier this should be negotiated at the purchase stage.

With regards to the afore mentioned document by John Sandham IEng MIIE MIHEEM I agree, it is an excellent piece, however is there? or has there been an "official" seal of approval on any of the content?
Seymour
smilewink


A problem is a gift to be unwrapped :rolleyes:
Joined: Jul 2002
Posts: 123
Savant
Offline
Savant
Joined: Jul 2002
Posts: 123
Ken


Q. "If a trust decides to farm out the work to a third party maintenance company, then what level of service will they insist on and who makes the decision and what do they base it on."

A. https://www.ebme.co.uk/arts/mdem.htm

Bill


Bill
Joined: Jun 2002
Posts: 6
Newbie
Offline
Newbie
Joined: Jun 2002
Posts: 6
I have wondered about this question for some time.
There are many jobs where there is just not enough resources to do the job properly as intended, so people do what is reasonable within the resources they are alocated at the time. This may be increased from time to time but will always lag behind what is considered necessary. We therefore use such techniques as risk analysis to make sure we do the important high risk jobs first and work down the list in the time available. If we can show that what we had done within the resources available was REASONABLE then I believe we would have a good case.
As far as going away from the manufacturers recommedations I think we would be on very doggy ground unless we could show that it was either common practice within the industry or that we had collected data over so many years and could show from it that this was a sensible and reasonable course of action.
Just aome thoughts to think about!!

Joined: Feb 2004
Posts: 14,815
Likes: 72
Super Hero
Offline
Super Hero
Joined: Feb 2004
Posts: 14,815
Likes: 72
This is good stuff ... let's keep it going!

The military system of engineering support was set up to take care of battle field repairs and did not serve users of medical and dental equipment very efficiently when I was Arte et Marte. Neither was the training course very good back in those days, following as it did the typical "green army" format. In fact the whole system relied heavily on the intregrity of a few good blokes who had escaped from the tank parks of BAOR!! We were the original Band of Brothers!! Jolly good show, eh what?

The NHS is not the army (unfortunately). However, those of us familiar with Government healthcare in other lands (take Saudi Arabia as an example), will probably agree that the NHS is not so bad, all things considered.

My recommendation is to talk instead about *Risk* Centred Maintenance, whereby maintenance resources are targeted at equipment most likely to adversely affect "patient outcomes" if not properly supported (eg, defibrillators, ventilators, dialysis units, IV pumps ... and so on down the line). In essence, the way to start is to rank all equipment according to "patient-risk" and take it from there.

There is no need to waste resources on dross (eg, doing PM on low-risk or unused equipment, or, I might add, blindly turning-over stored equipment on a calendar basis as the army used to be so fond of doing). So there!

==============
Long Live Low Life


If you don't inspect ... don't expect.
Joined: May 2003
Posts: 167
rob Offline
Mentor
Offline
Mentor
Joined: May 2003
Posts: 167
Geoff, your obviously an ex 'crap hat' with a large chip on your shoulder. PS Huey Hind sends his regards.

Joined: Feb 2004
Posts: 14,815
Likes: 72
Super Hero
Offline
Super Hero
Joined: Feb 2004
Posts: 14,815
Likes: 72
"Judge ye not, lest ye too be judged"

Actually, I'm one of the most chip-free old gits that you're ever likely to encounter. So you've slipped up a bit there, Rob old buddy.

Anyway, let's keep on the topic, shall we. Where were we ... ?

But reciprocations to Hughie Hind (...I recall him as one of the best).

==============
Long Live Low Life


If you don't inspect ... don't expect.
Joined: Jun 2002
Posts: 14
Novice
Offline
Novice
Joined: Jun 2002
Posts: 14
"A follow-up report into the management of medical equipment finds that there is still room for substantial improvement across Scotland. It calls on the health service at local level and the SEHD (Scottish Executive Health Department) at national level to take further steps to minimise risks to patients."

Dont know if it as totally applicable to this topic, but Audit Scotland published a report recently about Equipment management ( which I have yet to read) but if anyone is interested here are the links to it (requires Adobe acrobat reader)

Better Equipped to Care report

Key Messages

Joined: Feb 2004
Posts: 14,815
Likes: 72
Super Hero
Offline
Super Hero
Joined: Feb 2004
Posts: 14,815
Likes: 72
Having just spent the last hour reading through all of the above (and saving John Sandham's piece for quiet reflection later on), all I can say is that "biomed" was far more satisfying when we all went around doing good deeds, with the primary aim of repairing kit.

Perhaps equipment doesn't need repairing so much these days, so the whole scene has degenerated into "asset management" and the like. It's all PFI and profit margins. And all this talk of litigation, competence etc. is a real turn-off. Who wants the hass?

It's all too much for an old desert-dweller like me. So I'm off to rebuild motor-bikes and program computers. And I sincerely wish you all well.

Good luck John. I was once like you. Keep on banging the drum as long as you can, my friend - but you'll never "win", I'm sorry to say. But let me recommend the book "The Way of the Peaceful Warrior" - essential reading for all true biomeds.

==============
Long Live Low Life


If you don't inspect ... don't expect.
Joined: Feb 2004
Posts: 14,815
Likes: 72
Super Hero
Offline
Super Hero
Joined: Feb 2004
Posts: 14,815
Likes: 72
End of story?


If you don't inspect ... don't expect.
Page 7 of 9 1 2 3 4 5 6 7 8 9

Moderated by  DaveC in Oz, RoJo 

Link Copied to Clipboard
Who's Online Now
1 members (daisizhou), 26,081 guests, and 100 robots.
Key: Admin, Global Mod, Mod
Newest Members
Pip Fox, Engzaki, MacMc, AraEmin, Edouardohaag
10,395 Registered Users
Forum Statistics
Forums26
Topics11,288
Posts74,594
Members10,395
Most Online69,877
Jul 17th, 2026
Powered by UBB.threads™ PHP Forum Software 7.7.5