I would refer any colleague interested in the concept of Risk-Centred Maintenance to the work of Canadian biomeds Mike Capuano and Steve Koritko. They published an article on this topic in the Jan-Feb '96 issue of the journal "Biomedical Instrumentation and Technology". You may like to take a look at the AAMI website.

They describe a practical approach to PM activity based upon need and perceived risk of failure (rather than the traditional date-oriented method, which is often wasteful of time and resources).

Having given a great deal of thought over the years to the efficient administration of biomedical engineering services, I have come to believe that Risk-Centred is the most sensible approach. Let's hear what the fraternity has to say about this!

If you think in terms of a better way, you will always find it. On the other hand, if you don't know (or care) where you're heading, any road will take you there!

==============
Long Live Low Life


If you don't inspect ... don't expect.
Joined: Jul 2002
Posts: 499
Sage
Offline
Sage
Joined: Jul 2002
Posts: 499
I agree it’s a realistic approach. As long as one keeps ones superiors informed of ones shortfalls in the schedule’s then ones gluteus should be well and truly covered so to speak..

L3 smile


No trees were harmed in the posting of this message. However, a large number of electrons were terribly inconvenienced.
كيف الآن يحمّر البقرة
Joined: Feb 2004
Posts: 14,815
Likes: 72
Super Hero
OP Offline
Super Hero
Joined: Feb 2004
Posts: 14,815
Likes: 72
The way it's done is that each item of equipment is given a Risk figure based upon pre-determined criteria, such as relevance to patient outcomes, types and degree of risk, whether some form of mandatory maintenance is applicable, whether the equipment has advanced self-test features etc. etc. From this its Priority for maintenance is established.

Later on, PM periods are shortened or lengthened according to the outcomes of the most recent PM's. The standard criteria to trigger a change in PM period is whether a repair was found necessary. All adjustment criteria is set up in advance, so senior management can be consulted and/or advised as need be.

A whole bunch of criteria can be used, and this is where the computerised maintenance management system really comes into its own. The Risk figures can be updated in light of experience, and PM periods can be automatically adjusted (it would be very difficult to run a Risk-Centered system manually). After a few years, the system should be self-balancing.

Look at C&K's paper for a full disertation. I set up my own system based upon their methods (ie, selected my own Risk criteria, PM period adjustment criteria etc.), and would be happy to share my ideas with anyone trying to give it a go.

==============
Long Live Low Life


If you don't inspect ... don't expect.
Joined: Jan 2004
Posts: 33
Visionary
Offline
Visionary
Joined: Jan 2004
Posts: 33
I can see where you are coming from on this one and it sounds like a sensible approach to PM's but where would you stand legally (in court) should there be an incident and it is shown that you have not been following the manufacturers recommended service intervals etc.
Is this where the
All adjustment criteria is set up in advance, so senior management can be consulted and/or advised as need be.
comes into it

A
Anonymous
Unregistered
Anonymous
Unregistered
A
How would you proceed with the assessment of risk, on a device to device basis, then? Say, for example, an electrosurgery unit?

Joined: Feb 2004
Posts: 14,815
Likes: 72
Super Hero
OP Offline
Super Hero
Joined: Feb 2004
Posts: 14,815
Likes: 72
Frank,

Forgive me, but I can't see the over-riding need to follow manufacturer's recommended service intervals. Is there some kind of contractual obligation? Some of the manufacturers' recommendations I have seen have been absolute garbage. Sometimes it doesn't exist at all (what happens then?). Other times it is OK. Also, what, exactly is an "incident" in the legal sense, and what type of documentation is deemed sufficient to protect against these?

So yes, senior management should always be in the loop. Then they can't say that they didn't know what was going on. Don't forget that they will always be ready to accept the kudos when things turn out for the better.

==============
Long Live Low Life


If you don't inspect ... don't expect.
Joined: Feb 2004
Posts: 14,815
Likes: 72
Super Hero
OP Offline
Super Hero
Joined: Feb 2004
Posts: 14,815
Likes: 72
RL,

It would be easy to show you on a laptop, but not to describe briefly here. In the implementation I have, a Risk factor can be set up for each type of equipment (type/manufacturer/model). Based on the C&K model, I have seven categories of Risk:- 1) Dangerous outputs 2) Frequency of mishap 3) Lack of protection 4) Maintenance aspects 5) Patient consequence 6) Relation to patient 7) Use and handling. Each of the categories has its own sub-menu of criteria. You can set up your own if you like. The figures for each are summed to give the overall Risk number.

We are looking for the PM Priority, which is calculated by the computer as Risk x (days since last PM/PM interval in days). PM work can then be carried out in order of Priority (ie, resourses are applied in order of need - a bit like triage in fact). Ultimately, we can arrive at a percentage figure for PM Effectiveness for each piece of equipment, being (Risk/Priority)*100. All good stuff, eh?

You could try an email to desertcoders@hotmail.com if you need more about the software.

==============
Long Live Low Life


If you don't inspect ... don't expect.
Joined: Oct 2003
Posts: 89
Adept
Offline
Adept
Joined: Oct 2003
Posts: 89
Geoff, Imagine the scenario.
You as a ebme manager have decided that Infusion pumps only have to be looked at every two years even though Manufacturers state yearly maintenance. You write to your trust manager informing him of this.
An Infusion pump overinfuses and results in a clinical incident. The pump hasn't been looked at in 18 months. The manufacturer washes their hands of it as service intervals were not followed. Do you honestly believe that your Trust manager will put him/herself on the line to back you or will they blame you for your 'Expert Advice'
We have to start living in the real world and realise that we know live in a world where litigation is a real threat to everyone. Accidents don't seem to happen now.Someone is always going to get blamed hence the fact you always cover your own back.


It's not something you can teach. I am that damn good.
Joined: Jul 2002
Posts: 2,020
Hero
Offline
Hero
Joined: Jul 2002
Posts: 2,020
But if a group of your peers agree that what you are doing is a valid alternative, then you are not negligent even if it goes against the established (read manufacturers) methods.
A paraphrase of "The Bolam Test" as proved in a court of Law, Bolam v. Frien Hospital Management.
If you are a lone maverick beware! If you are doing what a group of peers agrees with then you are OK. So just because we go against
the "established" way we will not be in the wrong, we just have to be reasonable in what we are doing.
This is what the NPSA benchmaking groups are about, getting peers together to get acceptable, agreed ways of working.
Robert


My spelling is not bad. I am typing this on a Medigenic keyboard and I blame that for all my typos.
A
Anonymous
Unregistered
Anonymous
Unregistered
A
A couple of recent cases have set precedents and actually clarified the ambiguous nature of this tort giving the Court the power to decide what is acceptable or reasonable Rojo - not a group of "experts" who happen to cover each others back, so to speak - perhaps your knowledge of Bolam in this scenario is not as up to date as it should be.

Page 1 of 6 1 2 3 4 5 6

Moderated by  DaveC in Oz, RoJo 

Link Copied to Clipboard
Who's Online Now
1 members (daisizhou), 3,658 guests, and 121 robots.
Key: Admin, Global Mod, Mod
Newest Members
Pip Fox, Engzaki, MacMc, AraEmin, Edouardohaag
10,395 Registered Users
Forum Statistics
Forums26
Topics11,289
Posts74,595
Members10,395
Most Online69,877
Jul 17th, 2026
Powered by UBB.threads™ PHP Forum Software 7.7.5