The way it's done is that each item of equipment is given a Risk figure based upon pre-determined criteria, such as relevance to patient outcomes, types and degree of risk, whether some form of mandatory maintenance is applicable, whether the equipment has advanced self-test features etc. etc. From this its Priority for maintenance is established.

Later on, PM periods are shortened or lengthened according to the outcomes of the most recent PM's. The standard criteria to trigger a change in PM period is whether a repair was found necessary. All adjustment criteria is set up in advance, so senior management can be consulted and/or advised as need be.

A whole bunch of criteria can be used, and this is where the computerised maintenance management system really comes into its own. The Risk figures can be updated in light of experience, and PM periods can be automatically adjusted (it would be very difficult to run a Risk-Centered system manually). After a few years, the system should be self-balancing.

Look at C&K's paper for a full disertation. I set up my own system based upon their methods (ie, selected my own Risk criteria, PM period adjustment criteria etc.), and would be happy to share my ideas with anyone trying to give it a go.

==============
Long Live Low Life


If you don't inspect ... don't expect.