Home Articles Downloads Forum Products Services EBME Expo Contact
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 3 1 2 3
#7150 30/08/05 12:38 PM
Joined: Jun 2001
Posts: 464
Sage
Offline
Sage
Joined: Jun 2001
Posts: 464
We have, at last, secured the funding for a replacement database. We are currently using the older version of SEMS.
Has anyone moved away from SEMS to one of the other databases, if so, any probs?
We need to complete the trial and buying process within the next 6 months.

Cheers
Mark

#7151 30/08/05 2:28 PM
Joined: Feb 2004
Posts: 14,813
Likes: 72
Super Hero
Offline
Super Hero
Joined: Feb 2004
Posts: 14,813
Likes: 72
Hey Mark, all will be well as long as you remember the first maxim of database work – “garbage in – garbage out”! Regardless of whichever system you go for, you really need a guy doing nothing else for three months or so to transfer, enter, edit etc. all the data. smile


If you don't inspect ... don't expect.
#7152 30/08/05 2:48 PM
Joined: Feb 2002
Posts: 43
Technologist
Offline
Technologist
Joined: Feb 2002
Posts: 43
Hi Mark,

We've already converted numerous HECS/SEMS databases over to E-MAT - as Geoff says: garbage in = garbage out.

We would normally do as many "dry-runs" over your data as necessary until such time as you sign-off to say you are happy with what has been converted into E-MAT .

We then recommend running E-MAT in parallel with your old system prior to your *LIVE* date to ensure no major problems when you switch the old system off for good.

Regards,

Paul Stockton
Barwick Systems
http://www.barwicksystems.co.uk
ISO 9001 Registered Firm

#7153 31/08/05 12:12 PM
Joined: Mar 2002
Posts: 31
Dreamer
Offline
Dreamer
Joined: Mar 2002
Posts: 31
Thanks mates,

We have been using HECS database and ECRI IPM procedures for the past 5 years . HECS is ok if you would like to use it as a static database without graphical statistical analysis, dynamic alerts, online requests, etc.We searched a lot of available databases in the market like GE Sophie 9000 System, Shire database from UK and the like but nothing matched our in-house development. Since I have got 13 years experience in the Biomedical Engineering field, I designed the whole database incorporating Equipment information, Warranty, contract alerts,critical equipment down alerts, test equipment calibartion expiry, repeat work orders alerts and then Management reports on down time, labour time,response time, purchase request and spare parts transactions, etc. Our new package generates Graphical representation of repair and ppm work orders completed Vs pending, type of repairs like : user errors, general, electrical, mechanical,etc for any given year and month. Basically, the package we developed in-house was in Oracle and web browser based with PDA, bar coding compatability. We are marching towards e-biomed which will happen in 2006. Our package is called MEMIS - Medical equipment management information system ( A gate way to e-biomed ).

Should any one be interested to know more about developing in-house Biomedical database for the hospital or for field service engineers and service transactions, I would be more than happy to assist and / guide you.

Cheers
Sen

#7154 31/08/05 4:28 PM
Joined: Feb 2004
Posts: 14,813
Likes: 72
Super Hero
Offline
Super Hero
Joined: Feb 2004
Posts: 14,813
Likes: 72
Yes, e-biomed is the way to go, Sen! Nice to have the resources that you must have, though (I assume). Are you guys thinking of selling your system, then? I could name more than one “industry standard” system that began in very similar circumstances to the one you describe. smile


If you don't inspect ... don't expect.
#7155 07/09/05 1:38 PM
Joined: Mar 2002
Posts: 31
Dreamer
Offline
Dreamer
Joined: Mar 2002
Posts: 31
Thanks Geoff,

MEMIS is my brain work but developed in Oracle database by our ITD team . So, the royalty should come to me ...... I don't mind sharing my pie with anyone who wants to get me a business ....ha...ha..ha....

Sen

#7156 08/09/05 7:40 AM
Joined: Jul 2002
Posts: 35
Visionary
Offline
Visionary
Joined: Jul 2002
Posts: 35
We had SEMS now using OPTIM Interested to hear your views on this one.

#7157 07/10/05 12:25 PM
Joined: Jul 2000
Posts: 1,968
Likes: 32
Hero
Offline
Hero
Joined: Jul 2000
Posts: 1,968
Likes: 32
I was speaking to the EBME manager at Bedford this week who recently (This summer) switched from HECS to E-mat. They are very pleased with the way it operates, but especially with the reporting side of things. One point made was how responsive Barwick are with tech support. smile


Be Proactive and reactive.
#7158 07/10/05 12:42 PM
Joined: Feb 2003
Posts: 380
Sage
Offline
Sage
Joined: Feb 2003
Posts: 380
OPTIM is a good database but the aftersales support needs to be improved!! This is outsourced by Philips to a guy who is only contracted to work on it for 20% of his time!!!

#7159 08/10/05 4:27 PM
Joined: Mar 2004
Posts: 73
Scholar
Offline
Scholar
Joined: Mar 2004
Posts: 73
In addition I would like to add that one of the key reasons we chose Barwick over the Optim (Philips) system (and others) is because of their second to none responsiveness & Customer Support (after sales).

All the Barwick team have a very good work ethic in this regard, I have learned.

We were constantly chasing Philips, even when we had capital money busy burning a hole in our pockets. That was frustrating, so imagine, we mused - how will they be when we have paid the money and have a techie problem? Hmmm.

Past performance is the best indicator of future performance.

I have never been disappointed with our current provider, in fact Barwick have exceeded my (rather stringent) expectations.
I just cannot fault them.

Page 2 of 3 1 2 3

Moderated by  DaveC in Oz, RoJo 

Link Copied to Clipboard
Who's Online Now
1 members (daisizhou), 3,269 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Newest Members
Danny1621, zeedox, Eman Abdallah, OmarLY, Hans Pauwels
10,384 Registered Users
Forum Statistics
Forums26
Topics11,274
Posts74,576
Members10,384
Most Online69,877
Jul 17th, 2026
Powered by UBB.threads™ PHP Forum Software 7.7.5