Actually, the possibility of maintenance work unintentionally contributing to failures
does get a mention in John’s article, Rick.
One question that I have is, in the “Run-to-Failure” (RTF) model (ie, where an equipment type is deemed not to be worth maintaining, economically speaking), once the inevitable failure occurs, does it get repaired or binned? Binned, I suppose. But then what? Does it get replaced? Will a like-for-like replacement be available? Won’t a replacement cost more than the original equipment (on which the “BER” calculation would have been based)?

Let me suggest another maintenance model – inspect everything, and repair everything! We could even call this the “RAF Model”!
